Here is our warm reminder.:
Before your equipment goes into production,
The equipment should be checked in detail.!
01 Pre-start check
1)Check the engine、Gearbox、Hydraulic tank、Check whether there is leakage in the liquid storage tank of the water tank and other parts,Observe whether there is leakage in the oil-gas-water pipeline.、Whether there is aging phenomenon。
2)Check the liquid level and oil in the liquid storage tank of each part.(Antifreeze、Urine aqueous solution, etc)Oil quality。
3)Check whether the lubricating grease of each part is sufficient.。
4)Check the tension of the track、Tire pressure, etc。
5)Check the cleanliness of the surface of the cylinder rod。
6)Check the fan belt、Generator belt、Rubber damping for belt and key parts of air conditioning compressor、Whether the seal is aged。
7)Check the status of the air filter dust indicator。
8)Check the fuel tank and oil-water separator,Carry out drainage operation,Until the remaining liquid is pure diesel oil。
9)Check whether the instrument works normally after power transmission,Including water temperature、Oil temperature、Monitoring data of each level gauge and engine、Controller communication status。
Pre-start check
02 Check after startup
1)After the device is started(Restart the equipment after preheating when the ambient temperature is low),Observe whether the display of each instrument is normal.,Observe whether the operating parameters are normal.,Is there any alarm information?。
2)Idle operation 5-10 minutes,When the oil temperature rises to 40℃,Slowly operate the working device in situ,Make the lubricating oil of each part fully fill the key part,Cycle the handle for many times,And then put into production。
3)If the equipment is parked for too long,Travel at low speed and operate each work before carrying out load operation、Steering and brake handle for many times,Fully lubricate the equipment,Carry out load operation after confirming that all functions are normal.。
Check after startup
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale