Volvo Construction Equipment and its customer Skanska have recorded groundbreaking results from their Electric Site research project – including a 98% reduction in carbon emissions, a 70% reduction in energy cost and a 40% reduction in operator cost.

Volvo Construction Equipment (Volvo CE) and its customer Skanska have been testing the viability of the Electric Site research project over the last 10 weeks at Skanska’s Vikan Kross quarry, near Gothenburg, Sweden. The results are now in and they are even better than expected. The tests showed a 98% reduction in carbon emissions, a 70% reduction in energy cost and a 40% reduction in operator cost. The results also indicate that the Electric Site project takes a big step towards helping Volvo CE achieve its future vision where work sites are ten times more efficient, with zero accidents, zero unplanned stops and zero emissions. Together, these results support the potential for a 25% reduction in total cost of operations. However, at this stage, the reduction in total cost of operations is just a prediction. As the prototype machines are part of a research project and are not commercially available, it is impossible to give a guaranteed figure.
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale