Under the trend of stable epidemic situation, Sleep & throughout; The long-established construction sites are gradually being built. Wake up & throughout; Soon, the site will usher in. Rob period & throughout; . To the construction side, the boss, the operator, improve the efficiency of the operation of the crane is one of the ways to increase the income. In order to fully prepare for the resumption of work, the second live online broadcast of sany crane brought STC400T with both performance and efficiency.
As a flagship product of medium and small tonnage, the STC400T is 44.5m long main arm and 16m secondary arm with a maximum lifting height of 61m. G - class cross-country chassis, very strong passability, can adapt to a variety of complex road surface. The frame has been tested for 20,000 times, and its carrying capacity is stronger. The STC400T USES bipolar movable legs with a longitudinal span of 5.95m and a transverse span of 7.2m, comparable to the level of 50 tons of products.
The STC400T also has the ludeable operation room most favored by operators, which is equipped with a standard 7-inch color screen. The seat width is 460mm. The entrance space is increased by 10%. The new power matching and power control can reduce engine speed by 8% and save fuel by 15-25%.
In addition to excellent performance, efficiency is another major advantage of the STC400T. After fully understanding the needs of customers, sany crane through technical improvement, in the replacement rate of a great effort. It used to take a lot of tools to match the multiplier, which took at least 15 minutes. Now, it only takes four simple steps to complete the replacement, less than 5 minutes before and after.
In addition, STC400T is the minimum tonnage crane that applies self-disassembling and assembling activity balance weight. It can work flexibly and save cost without active balance weight. It has strong working performance with active balance weight and is not afraid of building height and road distance. This is STC400T & other; Bring your own casual clothes ” The secret of efficiency.
This live broadcast, there are many customers in the interactive area. To present oneself to others; , while affirming the performance of the equipment, it also puts forward its own improvement Suggestions. After r & d experts review, the following 10 Suggestions have been included in the sany crane product suggestion library, the proposer will receive a technical consultant award of 188 yuan, please accept the award from WeChat of the winning crane friend.
Wang hongning: the hook should be a little tapered, because the screw is exposed. When lifting the hook, the hook may swing on the steel hook, so it will not fall off automatically.
Ningling yutong hoisting 18937056661: the spare tire position needs to be improved. When the car is trapped, the rear towing hook will be blocked by the spare tire.
Lao wu: the circuit box is better on it, but you should make a protective cover, otherwise it will be broken by accident.
Crane for hire 15023148275: the space of the electrical box can be added with a grid, we can put the bills, we are added by ourselves.
Hongyunda hoisting 13540482008: it is suggested that manufacturers change the mirror on the winch into a visual system, the mirror is easy to be broken by branches, and a camera is more convenient for operators to observe.
Crane for hire (liu song)
Crane forklift wang qiang 15315527166: the air filter position can be close to the front or back, inverted platform space, facilitate the placement of spreader.
Yulong lease 15334617778: the design of the platform is still relatively high, small master put pad wood, to the cab of the car is more laborious!
Yancheng chengnan new area jinbiao crane co., LTD. : can you specially design a place on the platform specially put the wire rope?
The urea tank of 40 tons is too low, easy to mop the floor, can you raise it?
All said & other; Time is money and efficiency is life. ", so it seems that only by holding the powerful products in one hand and keeping the forward-looking thinking, can we remain invincible in the fierce market competition.
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale