Managing Director Michael Schmitz is full of praise for his 500 tonne Crawler Crane: “The fact that you can complete two jobs in a week demonstrates its fantastic transport logistics and the fast set-up time of the LR 1500”.
Crawler Cranes of this size are normally not the first choice for erecting construction cranes. But in this case it was the most economical solution. “Since we could get closer to the Tower Crane with the crawler after we had set up the boom system, which meant we could reduce the radius, the load case was easier to achieve than if we had used a large telescopic crane, for example an LTM 1750-9.1”, said Schmitz.
ACE Group BAP120+RAP60 Virgin & Recycled Integrated Asphalt Plant Successfully Put into Trial Production in Central Asia Project
Arriving in Laos! Installation of the ACE Group BAP80 batch asphalt mixing plant has officially commenced.
Cameroon Partners Visit ACE Group Factory in Hot July
SINOMACH Group Executives Conduct Site Visit and Exchange at ACE Group Xuchang Manufacturing Base
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale