By water, land or air? The “Autopista pacífico 2” site, a motorway, tunnel and bridge construction project in the remote forested, high altitude coffee region of Colombia needed a 220 tonne mobile crane. But the only access route by land included a bridge which the crane could not cross due to its 72 tonne operating weight. Carlos Enrique Parra Ibagón, Managing Director of Movitram Grúas S.A.S, and his team carefully weighed up all the options. Finally, they decided to transport the LTM 1220-5.2 to the site by water. However, this required extensive calculations and safety precautions as well as obtaining a series of permits.
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale