In earth-rock filling works,Quality of rolling construction,It has a decisive impact on the safety and life of the structure.。Effective compaction can ensure the bearing capacity of the structure.、Stability and durability,Prevent subsidence。With the scale of construction、Increase in construction intensity,It puts forward higher requirements for the quality control of earthwork filling construction,The traditional manual quality management mechanism can not meet the current requirements of large-scale mechanized construction and construction schedule.。
At present, hydropower construction in China,The compaction construction of earth-rock dam mainly adopts double control:Process control and final parameter control,However, the subjectivity of process control is relatively strong at present.,It mainly depends on the work experience of the operator.,Spot inspection is adopted for final parameter control.,Long existence detection period,The results can not truly reflect the reality of the compaction quality of the warehouse surface.。
So,The School of Surveying and Mapping of Wuhan University has studied a kind of continuity.、Real-time、High precision、Automation、Quality monitoring system for earth-rock filling and rolling construction with the characteristics of intelligence and the like,Real-time monitoring of filling and rolling construction process,And timely feedback to the construction personnel for control and adjustment,So that the filling and rolling construction quality is always in a truly controlled state.,This is of great practical significance to the construction quality of earth-rock filling project。
Introduction to functions of monitoring system software:
High-frequency real-time position information
Real-time rolling parameter information
Intelligent color marking of rolling times
Graphic visualization display
History can be traced back、Publish online
Introduction to hardware functions of the monitoring system:
Angle measurement accuracy:1″
Direct drive by ultrasonic motor
Range of rotation:360°(Vertical and horizontal)
Rotation speed:180°/Seconds(20℃Time)
Range measurement(Circular Prism):5,600 meters
Ranging accuracy(Circular Prism):1mm+2ppm×D
Range measurement(No prism):1000 meters
Ranging accuracy(No prism):2mm+2ppm×D
Compensation range:±5.5′
Compensation Unit:1″
Topcon GT-1200 measuring robot
Other parameters:
Waterproof and dustproof gradeIP65
Bluetooth wireless communication as standard
Bluetooth communication distance 600 meters(AndRC-PR5ACommunication test)
4.3-inch double-sided color touch screen
24-key single-sided backlit keyboard
Support secondary development
Application case:Dam body、Compaction of subgrade
⏏︎ Live video
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale