Investor of Luzhou-Gulin expressway Project
(1)Luzhou-Gulin expressway Project
This project starts near the canal dam in Naxi District.,Sequential connectionG76 Xiamen-Chengdu Expressway,Through the ancient town of Naxi District,Xianglin Town, Xuyong County、Dashi town,Huangjing Town, Gulin County、Gulin County,Connect to Xugu Expressway,Docking the Gulin-Jinsha Expressway under construction,The total length of this project is 100.15 kilometers,The investment estimate is about 300.5.6 billion yuan。
The main line of the project adopts full access control.、Technical standard for six-lane expressway with interchange,Design speed 100 km/Hour,Subgrade width 33.5 meters。Highway is adopted for vehicle load in bridge and culvert design.-ILevel;Asphalt concrete pavement。Other technical indicators comply with those issued by the Ministry of Transport《Technical standard of highway engineering》(JTG B01—2014)The relevant provisions of)。
(2)G93 Naxi New Town Interchange Project is added in the expressway of Chengdu-Chongqing Ring Line
The project route starts from the north-south trunk road under construction in Naxi District, Luzhou City.(Mianhuapo Avenue)South end point,Extend to the southeast,With the existingG93 expressway of Chengdu-Chongqing Ring Line“BType”Single Horn Interchange,Set up 5-in and 7-out toll station and management station building on the connecting line.。The investment estimate is about 2.9.7 billion yuan。
The single-lane ramp width of this project is 9.0 meters。Two-lane ramp width 10.5 meters,The design speed is 60/40Km/h。Other technical indexes conform to those issued by the Ministry of Transport.《Technical standard of highway engineering》(JTG B01-2014)、《Code for design of highway alignment》(JTG D20-2017)、《Detailed Rules for Design of Highway Grade Separation》(JTG /T D21-2014)。
First place:Leader of CRCC Kunlun Investment Group Co., Ltd.、
Member 1:China Railway Construction Bridge Engineering Bureau Group Co., Ltd.、
Member 2:China Railway Construction Port & Channel Engineering Bureau Group Co., Ltd.、
Member 3:China Railway First Survey and Design Institute Group Co., Ltd.、
Member 4:Guangxi Road and Bridge Engineering Group Co., Ltd.
Second place:China Power Construction Road Bridge Group Co., Ltd.
Third place:China Wuye Group Co., Ltd.
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale