Lintaige CSD2500B Helps Bolivia ES28 Highway Project

Lintaige CSD2500B Helps Bolivia ES28 Highway Project

May 26, 2023

Lin TaigeCSD2500BHelp BoliviaES28 road project

ElsiaESRoute 28 is located in the Chapare region of the Cochabamba Department, Bolivia.,The total length is about 30 kilometers.,Across the mighty Andes.,It connects Bolivia's two largest cities, Cochabamba and Santa Cruz.。

This timeESThe expansion project is the largest investment project of the Bolivian National Road Administration in the construction of highways.,The original highway was upgraded from two-way two-lane to two-way four-lane.。Since the country has no railways,,Relying heavily on road transport,The completion of the project will play an extremely important role in promoting the economic and social development of Bolivia.。

To helpES28 items,Lin TaigeCSD2500BIt was put into production in August 2019 and has produced about 200,000 tons of asphalt mixture.。The highway is a double-layer design of common asphalt mixture and modified asphalt mixture.,Full width 20.6m,Central reserve width 2.6m(Including curb strip 2×1.0m),Width of carriageway 2×7.0m,Hard shoulder width 2×2.0m。

ES28 items

The project was launched at the peak of the global COVID-19 pandemic.,Entry and exit blockades and international flights have been fused.。To ensure user project progress,Lin Taige uses engineer remote guidance.,Cooperated with the user to complete this.CSD2500BInstallation and commissioning work。

This is due to the rapid disassembly and assembly design of the whole container of the mixing plant and the fully automated system configuration imported from Germany.。The system can realize remote control.、Commissioning and troubleshooting。

The user's on-site staff shall follow the installation manual of Lin Taige,Self-standing through remote video call, etc.,The system is debugged through the remote support system of Lintaige.,Operation。After more than thirty days.,The project has completed all the installation and commissioning work.,Discharged successfully。

Lin TaigeCSD2500BAsphalt mixing plant

BoliviaESThe geological conditions along the 28 highway project are complex.,It is the most difficult section for the construction of Highway 4.。The slope in this area is loose.,Slope deposit washed by rain,Landslides and mudslides occur from time to time.。Due to the climatic and geological disadvantages of the region,,The requirements for asphalt mixing plant are very high.,Need to ensure the quality of asphalt mixture,Accurate proportion can meet the requirements of highway construction.。

Wang, who is in charge of the project, said.:“During construction,In order to overcome the adverse effects of the epidemic,Take into account the need to meet the No.4 National Highway,Lin Taige's engineers actively maintain communication with us.,Remote online installation and commissioning guidance,We operate according to the contents of the manual.,It took more than a month to complete the installation and commissioning of the mixing station.。At the same time,The construction site adopts 24-hour rotation operation.、Two-way simultaneous tunneling and other measures,Ensure that the highway project is opened as soon as possible,Lin TaigeCSD2500BIt can run smoothly for 24 hours without interruption.,Guarantee the supply of high-quality asphalt mixture。At the same time, we also attach great importance to localization management.,Project Quality Control Team、Right-of-way release team、A large number of senior employees, such as technical engineers, are local Bolivian engineers.,During the peak period of construction, the number of local workers was nearly one thousand.。”

Lin TaigeCSD2500BAsphalt mixing plant

Lin Taige witnessed the joint efforts of Chinese and Bolivian employees,Practice“The Belt and Road” Purpose ,And will see Elsia in the future.ESHighway 28 was opened to traffic smoothly。

Featured

XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!

XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!

Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!

Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!

Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened

Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened

Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks

Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks

Trending Products

XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower

XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower

XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining

XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining

XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower

XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower

XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale

XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale

Engineering Machinery Vocabulary
TO TOP