Danger removal and reinforcement construction of Tangxi Reservoir in Chaozhou, Guangdong
Curtain grouting Aperture:76mm Depth:40-70 meters

Machine model





KS800 Multifunctional roofbolter(Chai moves the walking money)
Construction site





Tangxi Reservoir is located in Tangxi Town, Raoping County, Chaozhou City, Guangdong Province.,Total storage capacity 3.8.1 billionm³,For the big (2)Type a reservoir,Engineering gradeⅡEtc,The main building is Grade 2.。
Construction process


Project:Reservoir reinforcement
Craft:Curtain grouting
Aperture:76mm
Depth:40-70 meters
Working condition:Earth+Weathered fossil
Drill pipe diameter:76mm
Length of drill pipe:2m
Construction effect


Construction angle:90°
Construction efficiency:40m/h
AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2023/202306/2023060811512745.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale