“Hold the handle and you will have a head start.!”
This isXE205GHVoice of Operator Hu Yongjun
What you hold in your hands reflects what you hold in your heart.
Two-handed control“Manipulator”
Work together to create wealth
This period is large“G”Experience Officer
Walk into the construction site of Changjun Road, Changsha Municipal Road
Learn about excavator master Hu Yongjun
YesXE205GHA unique experience
01“Manipulator”The ultimate control
Master Hu has been driving an excavator for more than ten years.,It cannot be said that the control handle is realized.“Man-machine integration”,For the bucket、Big arm、The whole set of forearm“Manipulator”Control experience,Still have a lot to say.。
“XE205GHThe shoveling force is very strong,Good coordination。The electric control handle is very light.,It's a quick move,People's words are very relaxed.,It is not tiring to work.,The efficiency will be improved naturally.。”
“(Electrically controlled)That's where the big trend is.,Just say,There is still a process of adaptation for people's hand feeling.,Pursue efficiency and maneuverability。”
XE205GHAdopt full electric control hydraulic system,Better pump and valve coordination,No throttling required,Quick oil return,Gravitational potential energy recovery。“Squeeze dry”Value per drop of fuel,More efficient,More fuel efficient。
02“Manipulator”A proud arm span
For“Manipulator”The length of,Master Hu is very keen.。“ Feeling (XE205GH)Boom、The stick is needed(Than the same tonnage I've driven before.)Long”,The advantages of this for construction are also obvious.。
“Metaphorically speaking,When laying the foundation for the culvert, Need (Upper arm and lower arm)A little longer,Walk a little sideways,And quick,To the concrete.,Throw it over,It's in place and smooth。”
Master Hu is right“Manipulator”Intuitive sense of length,Supported by data。
XE205GHWorking radius up to 9.92m,Collocation 1m³Big Bucket,You can have it in any construction site.“He who is near the water tower gets the moon first”Operational advantages。
03“Manipulator”The surging power of
For the power system behind this manipulator,,Master Hu also has his own unique understanding.。
“6-cylinder engine,It's not difficult to defeat it.。”
Facing different working conditions on the construction site,Whether it's land cracked by days of exposure to the sun,,Or the muddy earthwork soaked by water at the bottom of the foundation pit?,Or piles of gravel.,It's not difficult to support the six-cylinder engine.XE205GH。
“It is not only comfortable for people to operate.,The loading speed has also been improved.,More efficient loading。”
XE205GHIt is equipped with a customized Cummins IV low-speed high-torque engine.。Rated engine output up to 129kW,Transient response time reduced by 20 percent%,Maximum torque up to 850 N·M/1200rpm,Naturally, it can bring faster working speed and stronger digging force to the whole machine.。
Two-handed control“Manipulator”
These are two different hands.
A pair stained with mud, perhaps with a wound.
A pair of infinite power has machinery. “Magic”
These are two pairs of identical hands.
They all strive for the same goal.
Maintain practical strength
Hold up the hope of getting rich together
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale