Sany Heavy Industry Co., Ltd.: Prize-winning Q & A | How to Solve the Problem of Super Long Arm Scratching and Side Bending?

Sany Heavy Industry Co., Ltd.: Prize-winning Q & A | How to Solve the Problem of Super Long Arm Scratching and Side Bending?

December 06, 2023

Move up with crane tonnage,The number of main boom sections is increasing.,Arm length is getting longer,Under the influence of external factors,Upper arm downwarping、Problems such as side bending are aggravated.。Have arms and dare not stretch out,I can't do a job.,How to solve this problem??Let's get to know Trinity first.“Active Control Technology of Super-lift Synchronization and Side Curving”。


 

Hoisting person's exclusive test questions

【Precautions】Top 5 with correct answers and praise,Will be obtainedSany Crane Customized Gift Pack(Includes 2024 desk calendar+Thermos cup+Cap)。

【Answer time】 From now on--December 8th 16:00

1.“Active Control Technology of Super-lift Synchronization and Side Curving”The main solution         Question?

A. Heavy load dropping speed flameout

B. Insufficient site adaptability

C. Upper arm downwarping、Side Bend

D. The operation accuracy is not enough

2.“Active Control Technology of Super-lift Synchronization and Side Curving”Through        To identify the operating conditions、Deflection、Amount of side bending?

A. Sensor

B. Computer

C. Crane components

D. Numerical control system

3.“Active Control Technology of Super-lift Synchronization and Side Curving”It is mainly applied to        On the model?

A. Miniature crane

B. Small tonnage

C. Medium tonnage

D. Large tonnage

4.“Active Control Technology of Super-lift Synchronization and Side Curving”Passively control and adjust the left and right super-lift winch tension in the process of telescopic boom,Static flex resistance,Correct the side bend。The statement        

A. Mistake

B. Correct

5.“Active Control Technology of Super-lift Synchronization and Side Curving”It is mainly used to upgrade large-tonnage models.         Safety performance of working condition。

A. Short main boom working condition

B. Working condition of main boom super-lift

C. Long Tower、Jib working condition

D. Wind power working condition

There are also hanging friends who don't know the answer.

You can click“Review of past issues”Find the answer in

New technology for cranes,Innovation looks at Trinity

What new technologies do you want to know about cranes?

Let's go ahead and arrange

AI Translation Notice: This article was translated from Chinese into English using AI-assisted translation. Original source: http://news.lmjx.net/2023/202312/2023120609581884.shtml. The translation may contain errors, and the original Chinese source should be referred to for accuracy.

Featured

{php $recommend = $db->r('news',array('ishow'=>1,'icon'=>array('op'=>'>','opvalue'=>1)),'id,title,posttime,icon,intro,url',array('sql'=>' order by listorder desc limit 4'));}

Trending Products

XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower

XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower

XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining

XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining

XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower

XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower

XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale

XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale

Engineering Machinery Vocabulary
TO TOP