“The mountain is blocked by light snow,The river was blocked by heavy snow”,Beijing time on December 7, 17:33 ushered in the heavy snow solar term.,It means midwinter is coming。At this time,Temperatures below zero degrees Celsius have become the norm in northern China.,To ensure the quality of the project,Highway construction in the northern region has also entered a state of suspension.。
The working environment of most asphalt mixing equipment is in the open field.,Prolonged low temperatures、Rain and snow can easily make the related parts damp.、Corrosion、Aging and other problems,A fault is generated,Affect the use of equipment,Therefore, the daily maintenance work during the winter shutdown period should not be careless.,More attention should be paid to maintenance,Take care of your asphalt plant.。
Science Plan
According toMaintenance manualProceed
Damp-proof
Prevent rat damage
NoticeLubrication
Winter maintenanceGuide
Make a scientific maintenance plan
After the shutdown of the asphalt mixing plant in winter,A scientific and effective maintenance plan should be formulated.,Strictly follow the maintenance manual。
For some bearings that are greased regularly,Be sure to fill up with grease or cover the oil filler.,To prevent snow from seeping into the bearing.,Cause rusting。
For some important electrical components,Uch as an infrared temperature sensor,,To prevent lens fogging,It is better to disassemble, retrieve and preserve.。
Prevent snow, water, moisture, rust and rat damage
When the asphalt mixing plant is shut down in winter,Burner and motor shall be covered with tarpaulin,Do a good job of snow water、Damp-proof work。Cold and hot silos and dust silos shall be emptied,Prevent caking when entering the tide。Clean the dust remover.,Leak-proof and waterproof work shall be done after installation.,Prevent the cloth bag from getting damp, etc.。
Belt needs to be tensioned during production,After winter, the belts need to be adjusted to be loose.,Prevent the belt from cracking or deforming due to thermal expansion and contraction。
The harm of rodents to industry is mainly in the field of electricity.,In the winter,Many asphalt mixing plants are shut down for a long time.,The station may become a winter shelter for rats.,Cable Tray、The position of the control room shall be well protected against rats.,If necessary, take measures to protect the equipment, such as putting the rat killer.。
Maintenance of Asphalt Mixing Plant during Winter Downtime,A scientific inspection and maintenance plan should be made.,If problems are found, they should be solved in time.,Ensure that the equipment is in good working condition at all times,Make adequate preparations for production after commencement。
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale