As a strategy to promote the development of Guangdong-Hong Kong-Macao Greater Bay Area
Critical infrastructure
Shenzhen-Shantou Railway ProjectConstruction
It has attracted much attention
Recently,Shenzhen-Shantou Railway Project
Construction site of Luohu North Station Section
XCMG Assembles Complete Set of Equipment to Attack
Inject strong kinetic energy into project construction
Shenzhen-Shantou Railway Project
It's the country“Eight horizontal and eight vertical”In the high-speed railway network
An important part of the coastal corridor
Guangdong-Hong Kong-Macao Greater Bay Area
An important carrier of eastward radiation
It is also a special cooperation zone between Shenzhen and Shantou.
“Five iron and five high”An important part of outreach transportation
Shenzhen-Shantou Railway is drawn from Xili Station of Shenzhen Railway Hub.,Via Shenzhen Luohu、Ping Shan、Huiyang, Huizhou、Huidong,Access to Shenzhen-Shantou Station of Guangzhou-Shantou High-speed Railway,Total length of main line 125.486 kilometers,39 bridges,18 tunnels。
The design speed of Shenzhen-Shantou Railway is 350 Kilometer/Hour,It is expected to be completed,It only takes 30 minutes from Shenzhen-Shantou Special Cooperation Zone to the central area of Shenzhen.,The Shenzhen-Shantou Special Cooperation Zone will accelerate its integrated development with Shenzhen.、Integration into the Guangdong-Hong Kong-Macao Greater Bay Area is of great significance。
▲Layout Plan of Shenzhen-Shantou Railway Project
Shenzhen-Shantou Railway Project
SSSG—Construction Site of Lot 8 Luohu North Station Project
Several XCMG rotary drilling rigs、Diaphragm wall hydraulic grab、
Assembly of complete sets of equipment such as double-wheel slot milling machine
Put all efforts into construction
The total length of the line is 126 kilometers.,Construction requires a maximum wall depth of 48mLeft and right,Average depth 45m,Average rock entry at 20-25m,The hardness of the rock formation is 60-110Mpa,The average weight of the reinforcement cage is 70t。
To ensure smooth construction,According to the geological characteristics,,8 sets of XCMG equipment have been put into operation,Cooperate with the sand layer、Construction of rock entry section。
Among,XugongXTCThe 120 double-wheel slot milling machine is outstanding in construction.,Its fully guided three generation heavy duty turret、Three generations of drive units and heavy-duty milling wheels increase the torque by 10 percent%。High quality、High efficiency、The characteristics of low cost have been well received by the project side.。
XCMG rotary drilling rig relies on flexible power head mode switching.、Special hydraulic telescopic crawler chassis and large diameter slewing bearing,It ensures the stability and convenience of construction.。
Cross-sea Passage from Mawan、Deep and medium passage
Shenzhen-Shantou Railway Project
The figure of Xugong shuttled among them.
Every dig.、Each pouring
They are all interconnected in the Greater Bay Area.
Solid help
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale