Recently,FangyuanHZSType 75 mixing station has been installed in Hulunbuir City, Inner Mongolia,It is used for the construction of Xinfa Reservoir Danger Removal and Reinforcement Project in Molidawa Daur Autonomous Banner.。
The project is mainly composed of water retaining dam section,、Overflow dam section and water conveyance system。The total storage capacity of the reservoir is 64.85 million cubic meters.,Beneficial storage capacity 809.20,000 cubic meters。The engineering grade isⅢEtc,The project scale is medium.,Block the water、Drainage、The grade of main structures such as water conveyance is Grade 3.。The design flood return period is once in 50 years.、The return period of check flood is once in 1000 years.。Homogeneous earth dam is still used for the reconstruction of the dam,The dam crest is 338 meters long,Dam crest elevation 228.40 meters。
At present,FangyuanHZS75 type mixing station has been put into production,Continuous supply of high-quality concrete to the construction site,To ensure the smooth progress of the project.。
(Wen/Ju Huaqiang)
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale