The temperature plummeted,Winter condition mode on
Whether the loader can be started smoothly
Become the top priority in the hearts of many machine friends
Mountain Mechanical Loader“For the winter”Maintenance Guide
Warm online,Start by servicing the engine
Help the machine to start smoothly,Start work efficiently
Loader Winter curing
SEM
MACHINERY
The starting is exquisite,Don't worry about starting work
The loader engine starts,Attention first“Cold”After“Hot”
Make full preparations according to the time.,Winter construction is more in place
The single starting time shall be less than 10s
At least 60 minutes between two startss
Stop starting when it cannot be started for three consecutive times
Restart after finding out the cause and eliminating the fault
After starting,3 minutes of idle warm-up is required.
The idling time in winter should be extended appropriately.
Do not immediately run the engine at high speed
Loader Winter curing
SEM
MACHINERY
There are considerations for downtime,The state does not drop the line
End the day's work,Before entering a full shutdown
Give the engine a little time to slow down.,Smooth start the next day
After turning off the key switch
The urea pump depressurizes、Suck back
Therefore, it is necessary to wait for 3 minutes.
The main power supply can be turned off
Prevent the urea solution in the pipeline from crystallizing at low temperatures
Avoid frost cracking of the pipeline
In case of long-term shutdown and storage,It needs to be started once a month
Idle for 5 minutes,Carry out relevant operation and inspection
Periodically activate the complete machine status,Sustained good performance
Loader Winter curing
SEM
MACHINERY
Drain well,Performance is under control
After daily completion,It needs to be drained in time
Engine Shuihanbao drain valve、Brake the drain valve of air reservoir
Fuel tank bottom drain valve
Lock the three water drain valves.,Reduce“Frozen oil” Probably
Power output is in good condition,More efficient operation
Smooth start,I'm not afraid to work in winter.
Reliable hard power
More“For the winter”Maintenance secret book on the way
Stay tuned,Be there or be square
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale