In a historic site conservation project in the Czech Republic,Anmai's environmentally friendly electric compaction equipment has played an important role.。
The project is located in the new town on the banks of the Metuye.(Nové Město nad Metují),Including road reconstruction and restoration of the historic center。The site retains a portion of the original county gate from the 16th century to 1874.,Some areas require careful excavation。
Archaeologists first made a comprehensive survey of ancient fortifications and roads.,Prehistoric artifacts from the Bronze Age have been found.,Concluded that the site was once a fortress.。
The archaeological excavation lasted for several weeks.,Road construction then began.。In order to preserve the local historical features,,Much of the material was retained.,This means that the compaction process should avoid destroying cultural relics.,It is also necessary to ensure sufficient structural strength.。
Anmai's range of electric compaction equipment was used at the construction site.。These machines run quietly on the construction site.,And exhaust gas is not discharged.,This is particularly important in sensitive urban environments.。
AnmaieARX 26-2. Light double-drum roller can meet heavy road construction tasks.。The equipment uses a fully electric drive and vibration system.,When fully charged, it can run continuously for 18 hours or more.。
This electric roller is also used to compact the sub-base.。Due to the sensitivity of the construction environment,The gravel is laid in two thin layers.,And separately compacted。Considering the road is a one-way street,The size of the roller is ideal.。
Anmai eATR Compactors are used to compact the base course under the paving stones and the material above the utility lines.。Anmai eAPF One-way plate compactors are also used to compact the base.、Materials near paving stones and utilities,Or treating granite blocks in rubble。Both machines use the same battery pack,Convenient and extended uptime。
>> The project has brought both modernization and conservation to the historic center.。Replacement of rainwater drainage pipes、After installation of lighting and intelligent traffic lights,The infrastructure there has been improved.,Widened roads also optimize traffic management.。
In order to preserve the character of the historic site,,The existing kerbs were kept in use,Thereby prolonging the service life of the original material.。In addition,The square bricks laid on the sidewalk highlight the historical sense of the fortifications and the gates of the original county town.,Green areas have also become larger than before.。
The whole project lasted more than three months.。
XCMG: Six bridges and two engines, XCA400L8 _ 1 is high-tech!
Set a New National Record, Sinotruk Heavy Truck Export Exceeds 14000 Vehicles in February!
Renovation of Patterns? Zhonglian Mining Machine "Customer Activity Day" Officially Opened
Good news of delivery | Batch delivery of 30 SJM 3090F wide-body dump trucks
XCMG Official 5m 1000W*2 Hand Push Operated Lifting Telescopic Mobile Metal Halide Lamp Balloon Light Tower
XCMG Official 5m Hand Push Lifting Telescopic Mobile Halogen Lamp Light Tower for Construction Site and Mining
XCMG Factory 9m Hydraulic Mast Diesel Generator Trailer Mobile LED Stadium Light Tower
XCMG Official 7m China New Mobile Diesel Generator Explosion Proof LED Work Light Tower for Sale